Search
April 25, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
ISO-NE Finds Potential to Connect 9,600 MW of OSW Without Tx Upgrades
ISO-NE estimated transmission costs with revised offshore wind interconnection points.
ISO-NE estimated transmission costs with revised offshore wind interconnection points. | ISO-NE
|
A new analysis by ISO-NE shows about 9,600 MW of offshore wind may be able to connect to the New England transmission system without triggering the need for upgrades.
ISO-NEOffshore WindOffshore Wind PowerTransmission Planning