Search
`
December 3, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM OC Briefs: Nov 8, 2024
A PJM graphic details the schedule of transmission outages planned while upgrades are made under the third window of the 2023 Regional Transmission Expansion Plan (RTEP).
A PJM graphic details the schedule of transmission outages planned while upgrades are made under the third window of the 2023 Regional Transmission Expansion Plan (RTEP). | PJM
|
The PJM Operating Committee endorsed a quick fix proposal to revise Manual 13: Emergency Operations to add transparency to the Day Ahead Scheduling Reserve.