Search
April 19, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
FERC: NYPA Must Pay PJM for Tx Upgrades
FERC dismissed a complaint from the NYPA that alleged it was not responsible for PJM’s charges after a transmission facility relinquished withdrawal rights.
NYISOPJMTransmission Operations