Search
April 23, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
RPS Targets’ Cost: $13.7B in Tx Upgrades
PJM could get 30% of its energy from wind and solar power without reliability problems, but it could require as much as $13.7 billion in transmission upgrades, according to a long-awaited study.
PJM Market Implementation Committee (MIC)Transmission Planning