Search
April 25, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM, MISO to Scrap $20M Threshold for Joint Tx Projects
The threshold was identified as an obstacle to transmission projects that could ease constraints along the PJM-MISO seam.
FERC & FederalTransmission Planning