Search
April 25, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
FERC Finds PJM ARR/FTR Market Design Flawed; Rejects Proposed Fix
PJM must develop a new method for allocating auction revenue rights that doesn’t consider extinct generators, FERC ruled.
FERC & FederalFinancial Transmission Rights (FTR)PJMPublic PolicyVirtual Transactions