Search
April 23, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
ERCOT BoD Briefs: June 13, 2017
LP&L Study: Production Costs Increase
The ERCOT board learned that Lubbock Power & Light’s potential transition from SPP could result in as much as $77 million in increased production costs.
ERCOT Board of DirectorsReliabilityResource AdequacyTransmission Operations