Search
April 18, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
ISO-NE Analysis Shows Benefits of Shifting OSW Interconnection Points
Summary of estimated ISO-NE transmission costs through 2050
Summary of estimated ISO-NE transmission costs through 2050 | ISO-NE
|
Relocating two offshore wind points of interconnection from Maine to Massachusetts could reduce New England’s transmission upgrade cost requirements, ISO-NE said.
ISO-NE Planning Advisory Committee