Search
March 10, 2026

PJM Operating Committee (OC)

PJM Considering Tougher Regulation Requirements
PJM is considering a significant increase in the performance requirements for participants in its frequency regulation market.
PJM Operating Committee Briefs
At last week's PJM Operating Committee, PJM and NYISO released last week their joint whitepaper on replacing the Con Ed-PSEG wheel, which will end May 1.
PJM Generator Notification Plan Gets Mixed Review
PJM has found a way to provide generators with the performance assessment hour alerts that owners requested, but it’s not going to be easy.
PJM Operating Committee Briefs
PJM told the Operating Committee that generators will maximize their revenues and avoid penalties during performance assessment hours by just doing what they’re told.
Analysis Recommends Continuing Reduced Con Ed-PSEG ‘Wheel’ for Grid Stability
PJM and NYISO officials said that an analysis indicates a reduced version of the current pattern is the best resolution when the Con Ed-PSEG ‘wheel’ ends.
PJM Operating Committee Briefs
PJM’s Operating Committee reviewed tightened metering requirements and approved sunsetting the Systems Information Committee, reassigning its responsibilities to the Data Management Subcommittee and the new Tech Change Forum.
PJM Plans for Changes in Tx Flows Without Con Ed-PSEG ‘Wheel’
PJM is using a three-pronged approach to prepare for next year’s termination of the Con Ed-PSEG wheel.
PJM Operating Committee Briefs
Two 345-kV lines that were knocked out when a tornado leveled four transmission towers in ComEd territory are back online.
PJM Operating Committee Briefs
Capacity Performance units no longer would be compensated for participating in cold weather testing under a plan by the PJM Operating Committee.
PJM Operating Committee Briefs
About 1,900 MW of behind-the-meter generation may be unavailable because of tightened environmental rules, PJM told the Operating Committee.

Want more? Advanced Search