PJM has developed a load forecasting process that has improved the grid operator’s prediction accuracy.
The PJM Operating Committee learned that the RTO is expecting “typical” temperatures and almost 50 GW of capacity beyond its projected peak load this winter.
PJM is considering a significant increase in the performance requirements for participants in its frequency regulation market.