Search
May 3, 2024

MISO Midwest

MISO
MISO Says 2nd LRTP Portfolio Should Run About $20B, Rate Mostly 765 kV
MISO suggested an approximately $20 billion portfolio for its second long-range transmission planning effort that contains several 765-kV line segments.
Xcel Energy
MISO Preps for Heat Wave, Anticipates Annual Demand Peak
MISO has enacted conservative operations, a hot weather alert and a capacity advisory for its Midwest region ahead of a widespread heat wave set to bake the U.S. this week.
MISO
Midwest Capacity Shortage Leads to Must-offer Talk
MISO’s capacity auction shortfall has nearly doubled its probability of load shedding in its Midwest region, prompting discussion of must-offer requirements.
© RTO Insider LLC
FERC OKs MISO’s Bifurcated Cost-allocation Tx Design
FERC has allowed MISO to use a separate-but-equal postage stamp rate divided between MISO Midwest and MISO South for some of its major transmission buildout.
Xcel Energy
MISO Schedules Cost-allocation FERC Filing
MISO plans to file in December to create separate but identical cost allocation designs for MISO Midwest and MISO South under its long-range transmission plan.

Want more? Advanced Search