Search
February 1, 2026

New York Independent System Operator (NYISO)

NYISO
Stakeholder Soapbox — There and Back Again: D.C. Circuit Again Considers NYISO’s Approach to Zero-Emission Mandate
Dozens of states have adopted emission-reduction targets aimed at fighting climate change. But how should RTOs account for those initiatives when their effects are delayed, uncertain, expensive for consumers or all of the above? 
© RTO Insider LLC
Deregulation Drove 25 Years of Innovation, IPPNY Panelists Say
The transition to a deregulated wholesale power market helped drive New York’s adoption of innovative energy technology and policies, panelists said at the IPPNY's 38th spring conference.
© RTO Insider LLC
‘Evolution’ Key Theme at IPPNY 2024 Spring Conference
The IPPNY Spring Conference highlighted New York's evolution over the past 25 years as a competitive energy market.
NYISO
FERC Accepts NYISO Proposal to Coordinate Queue, Transmission Processes
FERC approved NYISO’s proposed tariff revisions aimed at enhancing the coordination between its interconnection study processes, minimizing redundant study evaluations and streamlining study processes.
NASA
Coast-to-coast, Grid Operators Prepare for April Solar Eclipse
The upcoming April 8 solar eclipse will run a course from central Mexico to Newfoundland, but grid operators far from its path of totality will be dealing with its impact.
NYISO
NYISO Recounts Mild Winter
The Operating Committee was briefed on one of NYISO’s most humdrum winters, characterized by high temperatures, low gas prices and below-average loads.
Analysis Group
NYISO Business Issues Committee Briefs: March 13, 2024
The NYISO Business Issues Committee approved proposed tariff changes to allow energy storage resources co-located with a dispatchable generator behind a single point of interjection to participate in the markets.
Constellation Energy Corp
Hydrogen Getting Resource-specific Rules in NYISO Markets
NYISO initiated steps toward integrating hydrogen into its market, aiming for technology-agnostic rules to foster clean energy innovation.
Shutterstock
NYISO Defends 10-kW Minimum for DER Aggregation Participation
NYISO defended its proposal to set a 10-kW minimum requirement for distributed energy resources to participate in an aggregation. 
NYISO
NYISO Operating Committee Briefs: Feb. 15, 2024
NYISO’s Operating Committee voted to approve the results from the Expedited Deliverability Study (EDS) 2023-01 report that included 16 projects, two of which were found to be undeliverable.

Want more? Advanced Search