Search
December 15, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
MISO South Regulators Ready to Strike Out on Their Own for Tx Cost Allocation
Entergy Louisiana rebuilding a 230kV line over the Mississippi River in 2022
Entergy Louisiana rebuilding a 230kV line over the Mississippi River in 2022 | Entergy
|
MISO South states have signaled their intent to strike out on their own on a cost allocation design for long-range transmission projects located exclusively in the South subregion.
MISOTransmission Planning