Search
`
December 8, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Members Select Model for Installed Reserve Margin Study
The PJM Planning Cmte. voted to continue using a load model based on the period 1998-2006 in its calculation of Installed Reserve Margin (IRM) requirements.
Capacity MarketPJM Planning Committee (PC)