Search
May 12, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Maine Voters Reject Public Takeover of Electric Utilities
Referendum Targeted Central Maine Power, Versant
Versant Power President John Flynn checks in with a line worker doing a storm related outage Sept. 16 in Brewer, Maine.
Versant Power President John Flynn checks in with a line worker doing a storm related outage Sept. 16 in Brewer, Maine. | Versant Power
|
Maine voters decisively rejected a proposed public takeover of the state’s for-profit electric transmission and distribution infrastructure. 
MaineMainePublic PolicyResourcesTransmission