Search
December 5, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM MRC/MC Briefs: Aug. 20, 2025
Stakeholders Endorse Reworked Interconnection Jurisdiction
A PJM graphic details the "first-use" method for determining jurisdiction over generation points of interconnection. The RTO is seeking to replace the method with a "bright-line" test.
A PJM graphic details the "first-use" method for determining jurisdiction over generation points of interconnection. The RTO is seeking to replace the method with a "bright-line" test. | PJM
|
PJM’s Markets and Reliability Committee endorsed by acclamation a PJM proposal to rework how the RTO determines whether a new generation point-of-interconnection falls under federal or state jurisdiction.
PJM Markets and Reliability Committee (MRC)PJM Members Committee (MC)Transmission Operations