Search
December 5, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM Presents Shortlist of RTEP Projects
Also Expands Spare Equipment Philosophy Guidance
A PJM graphic shows power flows driving transmission violations identified in the 2025 Regional Transmission Expansion Plan.
A PJM graphic shows power flows driving transmission violations identified in the 2025 Regional Transmission Expansion Plan. | PJM
|
PJM presented its shortlist of projects for inclusion in the first window of its 2025 Regional Transmission Expansion Plan.
PJM Planning Committee (PC)PJM Transmission Expansion Advisory Committee (TEAC)