Search
April 18, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM Operating Committee Briefs: March 11, 2021
Cost Recovery for ‘IROL-critical’ Generators?
PJM proposed allowing generators critical for determining interconnection reliability operating limits to recover required upgrade costs.
GenerationPJM Operating Committee (OC)ReliabilityTransmission Operations