Search
April 25, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Transmission Upgrades for PJM OSW, Renewables Could Cost $3.2 Billion
RPS requirements among PJM states.
RPS requirements among PJM states. | PJM
|
A PJM study said transmission upgrades could cost as much as $3.2 billion by 2035 to accommodate state renewable goals.
PJM Transmission Expansion Advisory Committee (TEAC)State & Regional