Search
April 17, 2026
Devin Leith-Yessian
PJM Correspondent
Devin got his start in the newspaper world at the Meriden Record-Journal, covering small towns in central Connecticut and writing about everything from the town fair to the angry budget meetings about how much to spend on the town fair. A graduate of the journalism program at Central Connecticut State University, he left the Nutmeg State to cover PJM from his new home in Philadelphia. Though now a city dweller, Devin has retained his love of nature and will be exploring a whole new set of mountains and forests, some made out of concrete.

Recent Articles
FERC Rejects PJM Definition of Co-located Load
FERC partly approved PJM’s proposed clarifications on the interconnection requirements for generators seeking to serve adjacent load, but rejected the RTO’s proposed definition of “co-located load,” finding it deviated from the commission’s directive.
Read More


PJM MIC Briefs: April 8, 2026
PJM’s Market Implementation Committee endorsed an issue charge to explore how dual-fuel gas generators should reflect the downtime needed to switch fuels in their requirement to offer into the energy market.
Read More


PJM OC Briefs: April 9, 2026
The PJM Operating Committee endorsed manual revisions that included the elimination of a requirement that actual meter test results should be provided to the RTO.
Read More


PJM PC/TEAC Briefs: April 7, 2026
PJM presented manual revisions to replace its standard for determining whether a resource point of interconnection on a distribution facility falls under federal or state jurisdiction.
Read More


PJM to Present Initial Reliability Backstop Proposal
PJM is to present its initial design for a reliability backstop procurement intended to award multiyear capacity commitments for resources able to enter service within five years to serve large loads.
Read More


Want more? Advanced Search