Great River Energy
FERC approved Great River Energy’s request for transmission rate incentives for two MISO Multi-Value Projects it is working on.
The resignation of CEO Sophie Brochu sent a shockwave through the Canadian energy sector that could reverberate into New England.
FERC accepted Great River Energy’s slimmed-down annual revenue requirement for reactive supply and voltage control at eight of its plants.
MISO is reviewing an expedited project request from ATC to connect a massive Foxconn manufacturing plant that would be Wisconsin’s largest power user.
Great River Energy is urging MISO to account for the effects of inverter-based generation in the RTO’s transmission planning studies.
FERC granted Missouri River Energy Services an extension to comment on a series of “zonal agreements” submitted by ALLETE and Great River Energy.
Want more? Advanced Search