Lower Colorado River Authority (LCRA)
Texas regulators approved ERCOT’s methodologies for determining minimum ancillary services for 2026 while hinting at the same time that they are considering discontinuing the use of conservative operations.
The Gulf Coast Power Association celebrated its 40th anniversary — and the Texas Public Utility Commission’s 50th — during its annual fall conference.
ERCOT said it will pay Austin Energy a $2.86 million to settle an alternative dispute resolution stemming from the February 2021 winter storm.
Texas regulators have cited the state's right of first refusal law in denying Grid United’s request to build a link between ERCOT and the West.
ERCOT's Technical Advisory Committee endorsed two transmission projects with a combined capital cost of more than $760 million.
FERC and NERC continue to gather information from utilities, generators and grid operators on maintaining electric reliability during severe cold weather.
There's a new focus on winter weather in the Texas electricity market after February's winter storm drove the ERCOT grid to the brink of collapse.
ERCOT stakeholders have endorsed the first system changes addressing system changes stemming from the winter weather that almost shut down the Texas grid.
Want more? Advanced Search








