Search
April 9, 2026

MISO long-range transmission plan (LRTP)

DTE Energy
MISO in 2022: Seasonal Capacity, Fleet Turnover and Tx Planning
MISO's 2022 to-do list will be dominated by getting major transmission built and crafting a seasonal capacity auction.
MISO
MISO Wraps Annual Transmission Package
MISO's Board Week touched on its 2021 Transmission Expansion Plan, long-range transmission portfolio and a joint study with SPP intended to build transmission.
IBEW
MISO to Test Long-range Tx Allocation Benefits
MISO has plans to test its hypothesis that benefits from long-range transmission projects built in Midwest won’t deliver benefits to the South.
MISO
MISO Postpones 1st Cycle of Long-range Projects
MISO pushed its deadline for approvals of the first long-range transmission projects from March into late spring.
Xcel Energy
MISO Schedules Cost-allocation FERC Filing
MISO plans to file in December to create separate but identical cost allocation designs for MISO Midwest and MISO South under its long-range transmission plan.
© RTO Insider LLC
SPP, SEEM Woo Entergy Regulators at NARUC
Amid clashes with MISO on transmission planning and cost allocation, the Entergy State Regional Committee featured introductions to SPP’s and SEEM’s workings.
© RTO Insider LLC
MISO Regulators Adopt Civil Tone on Contentious Planning Issues
State regulatory staff and MISO continued to debate  the potential billions in spending called for in the RTO’s long-range transmission plan.
Louisiana PSC
La. Regulators Threaten MISO Departure over Tx Costs
 Louisiana regulators say they'll consider a split with MISO if ratepayers are forced to fund major transmission built in northern parts of the footprint.
MISO
MISO Hopes Bifurcated MVP Cost Allocation Will be Temporary
MISO said its proposal to conduct transmission cost allocation separately for the South and Midwest regions is likely to be in place for up to four years.
© RTO Insider LLC
MISO Tx Expansion Plans Proceeds to Board Vote
MISO's 339-project, $3.04 billion MTEP 21 is headed for approvals from the MISO Board of Directors. 

Want more? Advanced Search