Draft NYISO Study Finds $1.1B in Tx Upgrades Needed Before Changes to Methodology
Apr 6, 2026
|
The results of NYISO’s 2024 transitional cluster deliverability study show that more than $1.1 billion of high-voltage transmission upgrades would be required to accommodate 48 projects in the batch of generation projects.




