Search
April 6, 2026
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Draft NYISO Study Finds $1.1B in Tx Upgrades Needed Before Changes to Methodology
Cohoes Falls on the Mohawk River in Cohoes, N.Y.
Cohoes Falls on the Mohawk River in Cohoes, N.Y. | Shutterstock
|
The results of NYISO’s 2024 transitional cluster deliverability study show that more than $1.1 billion of high-voltage transmission upgrades would be required to accommodate 48 projects in the batch of generation projects.
Energy StorageGenerationNYISO Operating CommitteeTransmission OperationsTransmission Planning