Search
`
October 3, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Load Flexibility Could Hold Key to California Grid Constraints
Flexibility Fastest, Cheapest Option; Building Sectors, Refrigeration Offer Opportunity
By 2050, electrified buildings and vehicles will increase electricity loads and change the timing of the peak.
By 2050, electrified buildings and vehicles will increase electricity loads and change the timing of the peak. | Lawrence Berkeley National Laboratory
|
Load flexibility is the fastest and cheapest way to prepare for rising electricity demand, panel participants at a CEC-EPRI conference said.
Building DecarbonizationCalifornia Energy Commission (CEC)Conference CoverageDemand Response