Search
`
December 9, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM PC/TEAC Briefs: April 2, 2024
Denise Foster Cronin, East Kentucky Power Cooperative
Denise Foster Cronin, East Kentucky Power Cooperative | © RTO Insider LLC
|
The PJM Planning Committee is considering a change to an issue charge framing a discussion on how capacity interconnection rights can be transferred from a retiring generator to a planned resource in the interconnection queue.
PJM Planning Committee (PC)PJM Transmission Expansion Advisory Committee (TEAC)