Search
May 19, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM PC/TEAC Briefs: April 30, 2024
PJM presented a change to the scope of a component of its 2022 Regional Transmission Expansion Plan to rebuild the 230-kV Otter Creek – Conastone line to 500-kV.
PJM presented a change to the scope of a component of its 2022 Regional Transmission Expansion Plan to rebuild the 230-kV Otter Creek – Conastone line to 500-kV. | PJM
|
The East Kentucky Power Cooperative presented possible changes to the process for transferring capacity interconnection rights from a retiring generator to a replacement resource.
PJM Planning Committee (PC)PJM Transmission Expansion Advisory Committee (TEAC)Transmission Planning