RTC Deployed, ERCOT Takes on New Challenges in 2026
Interconnecting Large Loads, DRRS Among Top Priorities
Keith Collins (right) responds to stakeholder questions during December workshop on ERCOT's dispatchable reliability reserve service proposal. | © RTO InsiderÂ
Jan 2, 2026
|
Having finally added real-time co-optimization to the market like every other U.S. grid operator with an effort that began in 2019, ERCOT can turn its attention to other pressing issues.


