Search
April 19, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
CPUC Rejects CAISO Local Capacity Requirement
ISO Says 1,850 MW Needed in SF Bay Area to Meet NERC, WECC Standards
The San Francisco Bay Area needs another 1,850 MW of capacity to ensure reliability starting in 2021, CAISO says.
The California PUC rejected a huge boost in megawatts for the San Francisco Bay Area that CAISO insists NERC and WECC reliability standards require.
Resource AdequacyTPLWECC