Search
April 20, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Northeast RTOs Asked to Run Offshore Transmission Studies
PJM cost estimates range from $627 million to $3.2 billion, and OSW injection totals range from 6.4 GW to 17 GW.
PJM cost estimates range from $627 million to $3.2 billion, and OSW injection totals range from 6.4 GW to 17 GW. | PJM
|
A group of environmentalists and clean energy industry proponents asked RTOs in the Northeast to conduct interregional offshore wind transmission studies.
FERC & FederalISO-NENYISOOffshore WindPJMPublic PolicyTransmission Planning