Search
April 9, 2026

Transmission

© RTO Insider LLC
Overheard at OPSI 2021 Annual Meeting
The future of the grid and the adoption of new market rules to address PJM's changing generation mix were front and center during OPSI's annual meeting.
BOEM
New York Writing Ending to Tale of Two Grids
New York City is set to replace dirty power plants with clean energy from up the Hudson and in the ocean, with an estimated $26 billion in projects.
© RTO Insider LLC
MISO Regulators Adopt Civil Tone on Contentious Planning Issues
State regulatory staff and MISO continued to debate  the potential billions in spending called for in the RTO’s long-range transmission plan.
NY State
NYISO to Resume In-person Meetings Nov. 17
NYISO plans to bring most employees back to the headquarters building Nov. 1st and resume holding in-person stakeholder meetings on Nov. 17.
OPSI
FERC’s Christie Promotes State Perspectives at OPSI Conference
FERC Commissioner and former OPSI President Mark Christie spoke at the organization's annual meeting, arguing against federal transmission siting authority.
Avangrid
Avangrid ‘Focused on Defeating’ NECEC Referendum
Avangrid is “focused on defeating” a ballot referendum designed to halt construction of the NECEC transmission line, CEO Dennis Arriola said.
Advanced Solar Products
NJ Launches Grid Modernization Study
Growing solar and offshore wind generation requires modernization of New Jersey’s distribution interconnection process, the BPU said, kicking off a study.
ITC Holdings
Michigan Senate OKs Transmission ROFR for Incumbent TOs
Michigan’s Senate voted to grant incumbent transmission owners the right of first refusal to build and operate new transmission lines in the state.
Texas PUC
Texas PUC Nears Market Redesign’s Finish Line
Texas regulators accelerate their efforts to redesign the ERCOT market with a strawman proposal as they rush to meet a self-imposed December deadline.
Shutterstock
ISO-NE Planning Advisory Committee Briefs: Oct. 20, 2021
The ISO-NE PAC received a project list update for the Regional System Plan that included 12 new projects to resolve thermal overloads and voltage violations.

Want more? Advanced Search