Search
January 31, 2026

David Rosner

FERC
Trump Officially Names Rosner, a Democratic Appointee, FERC Chair
Confirming earlier reports, President Trump has officially named a Democrat, David Rosner, as FERC chair.
© RTO Insider 
FERC Independence Likely Coming to an End with Christie’s Exit
The departure of Mark Christie as chair of FERC likely signals the end of the agency's longstanding independence.
© RTO Insider LLC
Reports: Trump to Name Democrat Rosner as FERC Chair
In a surprise move, President Donald Trump will tap Democratic Commissioner David Rosner to become FERC chair, multiple news outlets have reported.
© RTO Insider 
Christie Says Farewell to FERC at Final Meeting as Chair
FERC Chair Mark Christie presided over his final open meeting, as he plans to step down in the coming weeks after completing work on several orders.
© RTO Insider
FERC Sides with Market Monitor over MISO in Compensation Dispute
FERC sided with MISO IMM David Patton, denying a petition from MISO that would have prevented the RTO from reimbursing the Monitor for reviewing the market impact of transmission planning.
PacifiCorp
FERC Commissioners Split on Incentives for Valley Link Transmission
FERC rejected the formula rates and hypothetical cost structure proposed for the Valley Link portfolio of transmission projects but granted it incentives.
© RTO Insider
EPSA Conference Tackles Markets in a Time of Rapid Demand Growth
Attendees at the Electric Power Supply Association’s Competitive Power Summit discussed how markets are responding to rapid demand growth.
© RTO Insider LLC 
NARUC Winter Summit Tackles Uncertainty Around Demand Growth
One of the major topics at NARUC's Winter Policy Summit was demand growth driven by data centers, which brings plenty of uncertainty with it.
FERC
FERC Approves IBR, Extreme Weather Reliability Standards
FERC approved four proposed reliability standards: three relating to inverter-based resources and one for extreme weather planning.
Shutterstock
FERC Approves PJM’s One-time Fast-track Interconnection Process
FERC approved a one-time measure by PJM to add up to 50 new projects to a cluster of projects to be studied beginning in April.

Want more? Advanced Search