Search
December 5, 2025

load shedding

FERC OKs Rules for “Non-Consequential” Load Loss
FERC last week approved a new reliability standard that will allow PJM and other transmission planners to plan for “non-consequential” load loss following a single contingency.
PJM Surprised by September Heat Wave
PJM cut loads in IN, MI, OH and PA Tuesday as a 90-degree heat wave pushed loads to the highest ever for September, stressing the grid at a time when much generation and transmission was offline.

Want more? Advanced Search