Long Island Power Authority (LIPA)
BOEM approved the construction and operations plan for the 132-MW South Fork Wind Project off Long Island.
The U.S. Department of the Interior approved the construction and operations plan for the 132-MW South Fork Wind Project being built for LIPA.
FERC will reconsider whether the 1% de minimis threshold and netting provisions of PJM's DFAX method result in fair transmission cost allocations.
Fishermen, environmentalists, labor unions and local residents broadly support the 132-MW South Fork Wind Project off Long Island.
The New York PSC ruled that projects located anywhere in the state may be eligible for state-sponsored EV prize competitions, granting a LIPA request.
The New York CAC met to discuss bioenergy emissions and the formation of a utility consultation group while also receiving updates from advisory groups.
Preliminary analysis suggests that a mesh-and-backbone network design would be best to integrate offshore wind into the New York grid.
LIPA could replace most of its fossil-fueled peaker plants with energy storage by 2030, saving ratepayers millions, according to a new study.
The New York PSC heard a progress report on a grid study to identify transmission upgrades and investments needed to meet clean energy goals.
FERC approved NYISO’s revised buyer-side market power mitigation rules, prompting a scathing dissent from Commissioner Richard Glick.
Want more? Advanced Search