Search
February 7, 2026

variable energy resources (VERs)

Primoris Services Corp.
Flexible Ramping Grows as Ancillary Service
RTOs and ISOs described their strategies for using quick ramping products to offset weather-dependent renewable resources at a FERC conference Tuesday.
ISO-NE Planning Advisory Committee Briefs: Feb. 17, 2021
Eversource Energy has proposed replacing a self-contained fluid-filled cable on its Connecticut transmission system.
© RTO Insider
SPP Generator Interconnection Group Wraps up Work
SPP members approved one of two Generator Interconnection Improvement Task Force recommendations but took no action on the second.
© RTO Insider
Vote to Make Variable Resources Dispatchable Falls Short at MOPC
The SPP MOPC failed to endorse a revision that would have required non-dispatchable variable energy resources (NDVERs) to register as dispatchable.
Power Sellers Urge Action on CAISO Flex Capacity
CAISO stakeholders are urging it to develop a plan to procure the flexible capacity resources needed to manage the integration of renewable generation.
© RTO Insider
FERC Denies Extension of CAISO Intermittent Resource Program
FERC rejected a CAISO proposal to extend the life of a program designed to protect some renewable energy resources from being assessed uplift costs associated with their variable output.

Want more? Advanced Search