Search
March 15, 2026
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
EDAM Utilities Moving to Develop RA Program
Letter to Regulators Signals How Backers Plan to Proceed with Effort
NV Energy is one of the utilities that signed on to the March 7 letter spelling out plans to develop an EDAM RA program.
NV Energy is one of the utilities that signed on to the March 7 letter spelling out plans to develop an EDAM RA program. | © RTO Insider 
|
The push to develop a resource adequacy program serving non-CAISO members of the ISO’s Extended Day-Ahead Market appears to be gathering momentum, with backers saying they aim to produce a draft design for the program in April.
EDAMResource Adequacy