Search
`
December 8, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Hickenlooper and Peters Introduce BIG WIRES Act
Requires FERC to set Minimum Interregional Transfer Requirements, but not for Texas
© RTO Insider LLC
|
The BIG WIRES Act would require FERC to set minimum transfer capabilities between regions to better connect the grid in order to promote reliability and ship cheap power around the country.
CongressFederal Energy Regulatory CommissionPublic PolicyPublic Utility Commission of Texas (PUCT)Transmission Planning