PJM Revises Non-capacity Backed Load Proposal
Sep 16, 2025
|
PJM revised elements of its proposal to create a non-capacity backed load product for large loads as the Critical Issue Fast Path embarks on determining how to address the reliability challenges posed by accelerating data center load growth.




