Search
April 20, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
FERC Issues Ride-Through Requirement for Small Generators
Small Generators, defined as under 20 MW, will be required to ride through abnormal frequency and voltage events under a rule approved by FERC.
FERC & FederalGenerationReliabilityTransmission Operations