Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
DC Circuit Upholds FERC’s Refund Order in Ameren Illinois Case
Construction of 345-kV transmission line foundations. | Michels Power
Jan 25, 2023
The court upheld a FERC order requiring $11.5 million in refunds from Ameren Illinois after 10 years of misreporting costs.
This will use one of your annual article gifts. Are you sure?
Here is the shareable URL for this article. Be sure to note it, as it will not be shown again: