Search
April 29, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Changes to CIP-014 Receive FERC Approval
Standard Update Removes On-site Data Storage
Glen Canyon substation in Arizona. CIP-014-2 is intended to ensure that transmission substations are protected from physical attacks that could result in damage to the bulk electric system.
Glen Canyon substation in Arizona. CIP-014-2 is intended to ensure that transmission substations are protected from physical attacks that could result in damage to the bulk electric system. | foam, CC BY-SA 2.0, via Wikimedia Commons
|
FERC approved NERC's removal of language from CIP-014 requiring compliance evidence to be stored on site.
CIPFERC & FederalNERC & Committees