Search
May 8, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
MISO Hopes Bifurcated MVP Cost Allocation Will be Temporary
RTO Still Hunting the Cost Allocation ‘Unicorn’
MISO says the flows through its constrained Midwest-South interface have been ...reciprocal... since 2019, belying the notion that the South is "free riding" on previous Multi-Value Projects in the Midwest.
MISO says the flows through its constrained Midwest-South interface have been ...reciprocal... since 2019, belying the notion that the South is "free riding" on previous Multi-Value Projects in the Midwest. | MISO
MISO said its proposal to conduct transmission cost allocation separately for the South and Midwest regions is likely to be in place for up to four years.
LouisianaMISOTransmission PlanningTransmission Rates