Search
April 19, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
MISO, SPP Roll out $1.755B Joint Tx Portfolio
Collaborative Effort Proposes 7 Projects; Would Save Customers $971M
Five of the proposed JITQ projects touch MISO's Dakotas, Minnesota and Iowa footprint.
Five of the proposed JITQ projects touch MISO's Dakotas, Minnesota and Iowa footprint. | MISO, SPP
MISO and SPP shared the Joint Targeted Interconnection Queue study's first draft, with seven projects that would resolve several transmission constraints.
MISOSPP/WEISTransmission Planning