Search
April 29, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
ISO-NE IDs $8.7M Tx Fix for Boston Area
National Grid to Install Reactor, Breaker
ISO-NE identified a 160-MVAR reactor at National Grid’s Golden Hills 345-kV substation as a key part of its solution to Boston’s 2028 needs.
ISO-NE Planning Advisory CommitteeTransmission Planning