Transmission
California Gov. Gavin Newsom signed a state budget and five-bill infrastructure package targeting reliability and building generation.
Two of the world’s richest men drew crowds when they discussed energy future at Edison Electric Institute’s annual conference last month.
MISO South regulators publicly opposed a postage stamp cost allocation design, potentially setting the stage for a showdown as MISO prepares for a third long-range transmission portfolio.
Canadian wildfires caused just the third ISO-NE capacity deficiency since 2016, demonstrating the increasing reliability threat of climate change.
FERC approved changes to MISO and SPP’s affected system study process to allow either RTO to order upgrades of limiting elements on tie lines.
Panelists held several discussions on interregional transmission planning, resource adequacy and the risks posed by extreme weather during the Mid-Atlantic Conference of Regulatory Utilities Commissioners (MACRUC) annual educational conference held from June 26 through 28.
Current or former FERC commissioners shared their views on the future of RTOs and the relationship between state and federal regulators.
Americans for a Clean Energy Grid gave MISO and CAISO top grades for regional transmission planning and development; PJM and ISO-NE scored poorly.
The state's Board of Public Utilities approved an additional expenses for the state’s $1.07 billion transmission project to connect offshore wind farms to the grid.
Interconnection costs are on the rise across the U.S., according to a Lawrence Berkeley National Laboratory analysis of thousands of projects in five organized electricity markets.
Want more? Advanced Search










