Search
May 22, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
IESO Tweaks Modeling for Outage Management
IESO begins its resource adequacy evaluation by derating its installed resources and imports (left column) based on factors such as effective forced outage rates. The resulting “available” resource stack (middle column) is measured against the projected demand forecast and required reserves. If there is excess capacity (right column), the ISO has a positive Reserve Above Requirement (RAR).
IESO begins its resource adequacy evaluation by derating its installed resources and imports (left column) based on factors such as effective forced outage rates. The resulting “available” resource stack (middle column) is measured against the projected demand forecast and required reserves. If there is excess capacity (right column), the ISO has a positive Reserve Above Requirement (RAR). | IESO
|
IESO is changing how it projects renewable generation output and its accounting for imports and planned loads in the forecasts it uses to manage generator and transmission outages.
Distributed Energy Resources (DER)Energy StorageHydropowerIESONPCCOnshore WindResource AdequacyResource AdequacyTransmission OperationsUtility-scale Solar