ISO-NE
ISO-NE Consumer Liaison GroupISO-NE Planning Advisory CommitteeNEPOOL Markets CommitteeNEPOOL Participants CommitteeNEPOOL Reliability CommitteeNEPOOL Transmission Committee
ISO New England Inc. is a regional transmission organization that oversees the operation of the electricity transmission system, coordinates wholesale electricity markets, and manages power system planning for the states of Connecticut, Rhode Island, Massachusetts, Vermont, New Hampshire, and most of Maine.
Hydro-Québec and various partners submitted six separate proposals to meet Massachusetts’ call for 9.45 TWh a year of renewable generation.
Connecticut Governor Dannel P. Malloy ordered state regulators to assess the economic viability of the Millstone nuclear power plant.
Vermont regulators and utilities are working with ISO-NE to resolve transmission constraints in the northern part of the state.
ISO-NE presented guidance for distribution-connected generation to the NEPOOL Reliability/Transmission Committee.
Rhode Island is seeking ways to sustain a recent surge in jobs stemming from the growth of renewable and distributed energy resources.
Maine Gov. Paul LePage followed through on his promise to veto a solar net metering bill, calling it bad policy that would “result in irrational outcomes.”
The D.C. Circuit upheld a Connecticut law that requires utilities to enter into contracts with renewable energy facilities.
ISO-NE presented its monthly operations report to the New England Power Pool (NEPOOL) Participants Committee's at their summer meeting.
Massachusetts officials the state’s electric distribution utilities must procure a combined 200 MWh of energy storage by Jan. 1, 2020.
Following FERC’s technical conference on tensions between wholesale electric markets and policy initiatives, the commission invited comments on five paths.
Want more? Advanced Search










