Search
`
October 3, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM MRC/MC Briefs: Aug. 21, 2024
PJM presented the factors leading to an increase in capacity costs in the 2025/26 Base Residual Auction.
PJM presented the factors leading to an increase in capacity costs in the 2025/26 Base Residual Auction. | PJM
|
Consumers and electric distributors in PJM opposed a proposal to revise two financial parameters used to calculate the cost of new entry input to the 2027/28 Base Residual Auction.
Capacity MarketDemand ResponseEnergy MarketFinancial Transmission Rights (FTR)Natural GasPJM Markets and Reliability Committee (MRC)PJM Members Committee (MC)