Search
December 18, 2025

SPP Briefs: Week of Dec. 9, 2019

SPP’s internal Market Monitoring Unit last week released a white paper detailing a study of generator self-commitments in the market, yielding further evidence that the self-commitment of generation exerts downward pressure on marginal clearing prices.

The MMU said that while the practice can’t be eliminated, it can be “substantially” reduced.

“A smaller distortion will likely help market participants make better short-run and long-run decisions, which tends to coincide with improved profit maximization. Enhanced profit maximization combined with effective regulation and monitoring will likely lead to ratepayer benefits in the form of cost reduction,” the Monitor said in its report, “Self-committing in SPP markets: Overview, impacts, and recommendations.”

The MMU recommended that SPP’s market design be modified to include one additional day of optimization and that the RTO and its stakeholders reduce the incidence of self-commitments to improve price formation and market efficiency.

“Simply eliminating self-commitment without any additional changes could result in an increase in total production costs,” the Monitor said. “When lead times were shortened to reflect an additional day in the market optimization and self-commitment was eliminated, producers were paid more and production costs declined.”

The study echoes recent work conducted by the Sierra Club and the Union of Concerned Scientists. The environmental groups have both studied regulated utilities’ practice of self-committing coal plants, which they say is costing ratepayers hundreds of millions of dollars. (See Enviros, States Question Coal Self-commitments.)

The MMU analyzed offer behavior from March 2014 to August 2019. It ran two simulation series of a week per month for the year leading up to August in which it resolved past market cases.

The study found prices and production costs were “systematically lower” when at least one self-committed unit was marginal. In almost all cases, the MMU said, self-committed generators had lower revenues because of negative congestion prices, while market-committed generators typically had a more balanced congestion profile.

Resources with long lead times and/or high start-up costs tended to be self-committed instead of market-committed, the Monitor said.

The simulations assumed all generation was offered in market status, and that generation offered in market status can be started economically by the day-ahead market.

Board Appoints Stakeholder Group Chairs

The Board of Directors on Dec. 9 appointed chairmen for eight of SPP’s stakeholder groups:

  • Grant Wilkerson, Evergy, Business Practices Working Group
  • Alan Klassen, Evergy, Operating Reliability Working Group
  • Robert Pick, Nebraska Public Power District, Regional Tariff Working Group
  • John Allen, City Utilities of Springfield, Reliability Compliance Working Group
  • Jim Jacoby, American Electric Power, Seams Steering Committee
  • Phil Clark, Arkansas Electric Cooperative Corp., Security Working Group
  • Brad Hans, Municipal Energy Agency of Nebraska, Supply Adequacy Working Group
  • Nathan McNeil, Midwest Energy, Transmission Working Group

The chairs were nominated to two-year terms that begin in January by the Corporate Governance Committee. The CGC annually accepts member nominations for about half the stakeholder group chairs.

The board also approved changes to 13 stakeholder groups’ charters during a conference call otherwise reserved for a review of membership surveys and corporate metrics. The board’s evaluation by directors and members resulted in a split, with average scores dropping for half the 12 questions and rising for the other six.

Asked to list issues of focus for the board next year, members settled on CEO succession, expansion in the West and effective implementation of the Holistic Integrated Tariff Team’s (HITT) recommendations.

Seams Group Lays out 2020 Work Priorities

The Seams Steering Committee on Wednesday determined its work priorities for 2020, with a prime focus of providing policy direction as cost allocations are determined for seams projects that don’t qualify as interregional projects. The item was a carryover from 2019, when it was tabled to wait on the HITT’s recommendations.

SPP

October’s market-to-market summary | SPP

The SSC will also guide staff through coordinated system plan studies in developing seams projects with MISO and Associated Electric Cooperative Inc. It will also continue to facilitate design and development of a new type of transmission project, coordinated with MISO, to address historical market-to-market (M2M) congestion.

Staff reported that M2M settlements in October resulted in $3.65 million accrued in SPP’s favor. Permanent and temporary flowgates were binding for 1,068 hours during the month.

SPP has incurred $67.2 million in M2M settlements since the process began in 2015.

Sunflower’s Hestermann Elected WIRES President

Sunflower Electric Power’s Tom Hestermann has been elected president of WIRES, an international trade association that promotes investment in the high-voltage grid.

SPP

Tom Hestermann, Sunflower Electric | © RTO Insider

Hesterman, Sunflower’s manager of transmission policy regulations, succeeds National Grid’s Brian Gemmell.

“The critical importance of a robust and resilient grid multiplies” as transportation and heating move toward an electrified future and states continue to pursue aggressive renewable portfolio standards, Hestermann said. “WIRES will redouble our efforts to educate and advocate for advancements in North America’s transmission infrastructure.”

Other elected officers include: President-elect Brian Drumm (American Transmission Co.’s federal regulatory relations & policy and associate general counsel), Vice President David Weaver (Exelon Utilities’ vice president of transmission strategy), Treasurer Kelly Pearce (American Electric Power’s transmission asset strategy & policy managing director), and Secretary Dan Prowse (Manitoba Hydro’s Hydro Connections Department transmission access officer).

— Tom Kleckner

Batteries Will Have Their Day in MISO, Experts Say

By Amanda Durish Cook

INDIANAPOLIS — Energy storage systems will inevitably take hold in MISO as costs decline, but the outlook for technologies outside lithium-ion batteries is less certain, storage experts told stakeholders Wednesday.

The experts were speaking on a panel convened by MISO’s Advisory Committee in lieu of the usual “hot topic” discussion where members sound off on current issues during committee meetings. The AC was unusually quiet during the event, instead electing to hear the panel of outsiders talk battery storage.

“Today we’re focusing on batteries. What are they going to look like in 10 years? What are the limits? When do they become commercially viable at scale?” moderator and MISO Vice President of Strategy and Business Development Wayne Schug said in opening the panel.

MISO batteries
Judy Chang, Brattle Group | © RTO Insider

“Storage becomes very valuable when incremental capacity is scarce and expensive,” Brattle Group Principal Judy Chang said. She said she expected batteries to become cost-competitive when they serve capacity at peak times.

“I would say that utilities are beginning to explore storage with pilot programs,” Chang said of MISO’s situation, predicting that more storage will be constructed “when capacity is needed.”

MISO’s interconnection queue currently contains more than 2.5 GW of battery storage.

Consultant Mathew Roling said the rollout of battery storage in MISO would probably occur on a state-by-state basis, and battery solutions would be packaged with other technology or generation and not simply be standalone batteries.

National Renewable Energy Laboratory analyst Paul Denholm said four-hour batteries are close to becoming cost-competitive with peaking combustion turbines. Batteries’ ability to provide peaking capacity is especially heightened when they are paired with solar generation, he said.

Paul Mitchell, CEO of Indianapolis-based Energy Systems Network, said that while MISO hasn’t experienced much growth in battery storage systems, that will soon change.

“I think it’s finally going to come in full force,” he said, adding that “the biggest barrier remains the cost.”

Mitchell said battery storage costs aren’t quite as low as traditional generation, and current, 20-year storage contracts that promise to deliver energy at $300/kWh on average are essentially bets on the future value of storage systems — and they might be too optimistic.

“That’s putting a lot of trust in the future costs of energy storage systems. … That might be controversial to say,” he added.

MISO stakeholders in attendance participated in live polling during the panel, predicting that solid-state and vanadium redox flow batteries might emerge as the next dominant technologies.

MISO batteries
ESN CEO Paul Mitchell | © RTO Insider

Mitchell said he’s often privy to the innovations taking place at the Battery Innovation Center on Naval Support Activity Crane in southern Indiana. He cautioned that solid-state batteries right now are “teeny tiny” and nowhere near ready for factory manufacture. He said lithium-ion would continue to be the reigning battery option for at least the next five years.

“I think it’s going to take these technologies a long time to scale up … for the mass market of vehicles or in the grid,” he said.

Roling said the industry might be overlooking the benefits of pumped hydro storage in the rush to embrace battery storage.

“It’s water. It’s good for 100 years. It’s so natural it hurts,” he quipped.

Chang also pointed out that the environmental benefits of storage are system-dependent and only beneficial when batteries absorb and discharge energy from lower-emitting resources, displacing higher-emitting resources.

Roling said that unless MISO states become “anti-carbon,” battery storage in the footprint would never become cost-competitive. He said batteries would need “that social aspect” to be commercially viable.

To that, Chang pointed out that customers are increasingly calling for zero-carbon generation sources.

In another live poll, a majority of attendees predicted utility-scale batteries would become cost-competitive in MISO in about five to 10 years.

Stakeholders asked if storage might be able to flatten a potential duck curve before it even occurs.

Chang said the question was probably premature, as she believed wind would continue to dominate over solar generation in the footprint.

“I do think it’s unique here. I don’t think it’s the same as the West,” Chang said. “I don’t think we’re going to see the duck curve as quickly as in Texas or California. I think we have to be careful about taking one region and applying it to another.”

PJM MRC Preview: Dec. 19, 2019

Below is a summary of the issues scheduled to be brought to a vote at the PJM Markets and Reliability Committee meeting Thursday. Each item is listed by agenda number, description and projected time of discussion, followed by a summary of the issue and links to prior coverage in RTO Insider.

RTO Insider will be in Valley Forge, Pa., covering the discussions and votes. See next Tuesday’s newsletter for a full report.

Consent Agenda (9:10-9:15)

PJM will ask for endorsement of revisions to:

B. PJM Manual 13: Emergency Operations, incorporating event analysis updates.

C. PJM Manual 14D: Generator Operational Requirements, adding guidance associated with distributed energy resource ride through.

E. Manual 27: Open Access Transmission Tariff Accounting, addressing the implementation of the annual calculation of the border rate and the impact on firm point-to-point transmission service charges.

1. FTR Product Range and Auction Process (9:15-9:35)

The MRC will consider the first round of financial transmission rights credit-related policy changes after a two-week deferral. (See “FTR Vote Deferred,” PJM MRC/MC Briefs: Dec. 5, 2019.)

PJM said the recommendations, initially presented at the committee’s October meeting, will improve its credit risk policies after the Financial Risk Mitigation Senior Task Force delegated a more holistic FTR market review and possible design changes to a separate Market Implementation Committee task force. (See “FTR Market Rule Changes,” PJM MRC Briefs: Oct. 31, 2019.)

But some stakeholders expressed concerns earlier this month about the ripple effect the revisions may have on market design. The MRC agreed to delay a vote in hopes of finding compromise and moving the changes ahead.

2. Competitive Transmission Proposal Fee (9:35-9:45)

Stakeholders could endorse a new fee structure for competitive transmission proposals developed by PJM to better reflect the costs of its new comparative framework. (See “PJM Unveils Flat Fee Cost-containment Plan” in PJM PC/TEAC Briefs: Aug. 8, 2019.)

3. Comparative Cost Framework (9:45-10:05)

Along with the new fee structure, the MRC must sign off on corresponding Manual 14F language that memorializes the process, including the Independent Market Monitor’s role in reviewing proposals.

The language has been mired in wordsmithing after transmission owners objected to revisions that they said inappropriately capped certain costs. (See PJM TOs Wary of Cost Containment Rules.) There’s also been an ongoing debate over language codifying a collaborative role between PJM and the IMM in evaluating competitive proposals.

PJM deferred voting on both the fee structure and manual language at the Dec. 5 MRC meeting in order to further fine-tune language regarding these issues. (See “Comparative Cost Framework, Opportunity Cost Calculator in Flux,” PJM MRC/MC Briefs: Dec. 5, 2019.)

4. Real-time Values Problem Statement and Issue Charge (10:05-10:25)

Stakeholders will consider endorsing an issue charge that would address PJM-identified issues with the misuse of real-time values in parameter limited scheduling. (See “Real-time Values, Parameter-limited Schedules,” PJM MRC Briefs: Dec. 5, 2019.)

5. Governing Document Revisions for Parameter-limited Schedules (10:25-10:55)

PJM will seek endorsement of Tariff and Operating Agreement revisions that will correct language surrounding parameter-limited schedules (PLS) accidentally introduced with PJM’s Capacity Performance construct filing.

The RTO said the primary issue is that current language suggests that PJM can commit resources on their price PLS offer or cost-based offer during times that are in conflict with other sections of the Tariff and the OA.

The Monitor, however, says the PJM should modify the way it implements PLS to conform with the governing documents.

6. Modeling Generation Senior Task Force (MGSTF) (10:55-11:10)

The MRC will consider implementing near-term solutions of hourly differentiated segmented ramp rates at the recommendation of the Modeling Generation Senior Task Force.

The MGSTF developed the solutions to improve resource modeling for “complex resources” in PJM’s market clearing engines, including combined cycle units, coal units with multiple mills and pumped hydro.

7. Fuel Security Senior Task Force (FSSTF) (11:10-11:40)

The MRC will be asked to endorse recommendations from the Fuel Security Senior Task Force on next steps for potential governing document changes.

The task force, assembled in March, has been investigating what market responses to conditions could lead to fuel insecurity and assessing whether the current market construct is sufficient to cure the problem. (See PJM Stakeholders Reluctantly OK Fuel Security Initiative.)

– Christen Smith

NYPSC Reins in ESCOs, Expands Community DG

By Michael Kuser

The New York Public Service Commission on Thursday placed new restrictions and requirements on energy service companies (ESCOs) that they must honor and fulfill in order to sell to the state’s residential customers and small business owners (15-M-0127, 12-M-0476, 98-M-1343).

“This order to me is a reset,” PSC Chair John B. Rhodes said. “It clearly delineates what is no longer permitted on the foundational principle of protecting customers, and it acts against companies that have acted badly.”

The PSC said that “little has changed in New York’s retail energy market since 2014, when the commission observed that complaint rates related to ESCOs were high.”

In the past few years, the commission has waged a continual struggle to balance the idea of free markets and free choice with accountability for unscrupulous business practices. (See “PSC Continues Crackdown on ESCOs,” NYPSC Approves Higher Rates for Bitcoin Miners.)

NYPSC ESCO
DPS staff testify on the proposed ESCO regulations before the commission.

The commission and Department of Public Service staff recently concluded hearings before two administrative law judges, the transcripts of which total 4,233 pages.

The PSC’s order said that the non-ESCO parties, including the state’s Utility Intervention Unit, the attorney general, the Public Utility Law Project of NY (PULP), New York City and AARP, “all agree that the current retail access market does not benefit customers. Some argue the commission should shut down the market entirely, while others argue that the commission should implement systematic and substantial reforms to limit ESCO products and/or ESCO prices.”

DPS staff said that ESCO customers paid $1.2 billion more than utility customers would have paid for commodity service during the 36-month period ending Dec. 31, 2016.

“In general, the ESCO parties believe that little or nothing is wrong with the retail access market and argue that commission interference with ESCOs’ current access to customers is unwarranted,” the commission said. It added that last year saw ESCO customer numbers drop 12% compared to the previous year, to 2 million.

The ESCO parties included the National Energy Marketers Association, the Retail Energy Supply Association, Direct Energy, Agway, Constellation, Great Eastern Energy, Impacted ESCO Coalition and Infinite Energy.

The new regulations include enhanced eligibility criteria and increased scrutiny of business practices, more clear ESCO product and pricing information, and prohibitions on marketing gimmicks that lack energy-service-based value, such as sporting event tickets and gift cards.

The PSC also revoked the eligibility of Atlantic Power and Gas to participate in the state’s retail energy market after finding the company guilty of “a pattern of persistent disregard” for the commission’s consumer protections and “either unwilling or unable to observe the required business practices, even after having its eligibility to market to and enroll residential and nonresidential customers revoked in 2017” (16-M-0618).

Yes to Consolidated Billing for CDG

The commission also approved consolidating the utility bills of community distributed generation (CDG) customers, relieving project sponsors of the need to bill separately for the subscription charge and making it easier for consumers to see their energy benefits in one statement (19-M-0463).

The PSC has been developing the value of distributed energy resources (VDER) mechanism and promoting the growth of CDG for several years. (See NYPSC Refines Value Stack, Boosts Community DG.) CDGs allow customers not positioned to take advantage of rooftop solar installations to directly participate in renewable energy programs.

Thursday’s order directs utilities to automatically deduct the subscription charges a customer pays its CDG providers from the net renewable energy credits applied to the customer’s bill and send the money to the CDG project sponsor based on a percentage set by the sponsor.

“As this percentage must be below 95%, CDG members participating in consolidated billing will receive a guaranteed bill reduction, and therefore guaranteed monthly savings, of at least 5%,” the commission said.

NYPSC ESCO
The PSC held its regular monthly session in New York City on Dec. 12.

Several state utilities — Central Hudson Gas & Electric, Consolidated Edison, New York State Electric and Gas, Niagara Mohawk Power, Orange and Rockland Utilities, and Rochester Gas & Electric — submitted comments urging the commission to “consider whether such changes are warranted given the cost and time to implement and determine the proper mechanism for funding the transition to different billing mechanisms.”

The utilities argued that “a reasonable approach would provide for full recovery of all upfront and ongoing costs associated with implementing a new billing approach while also requiring the CDG host to pay for utility billing services.”

The commission also rejected National Grid’s proposal to compete for and acquire CDG customers and reduced the company’s proposed fee for consolidated billing by 90%, allowing the same 1% fee provided to other utilities.

The Alliance for a Green Economy, the Green Education and Legal Fund, and Joule Assets submitted comments in favor of consolidated billing, as did New York City and many smaller municipalities.

MISO Board OKs $4 Billion MTEP 19

By Amanda Durish Cook

INDIANAPOLIS — MISO’s Board of Directors on Thursday unanimously approved a $4 billion transmission portfolio consisting of 480 projects.

The 2019 MISO Transmission Expansion Plan (MTEP) was passed to the board by the Planning Advisory Committee without any suggested edits. (See MTEP 19 Advances to MISO Board Committee.)

“This is the largest MTEP cycle to-date, excluding MISO’s 2011 [multi-value project] portfolio,” Executive Director of System Planning Aubrey Johnson said during a Dec. 10 meeting of the board’s System Planning Committee.

MISO Board MTEP
Top 10 most expensive MTEP projects | MISO

MTEP 19 Highlights

Six of MTEP 19’s top 10 most expensive projects are clustered near the Detroit and St. Louis areas.

Johnson said the Detroit area is experiencing enough load growth to warrant MTEP 19’s most expensive project, which includes several miles of aboveground 230-kV and underground 120-kV circuits and a pair of substations at $139 million.

ITC Transmission said several Detroit-area 120-kV underground cables are projected to overload in the future and the project will allow connection with DTE Electric loads in the city.

Other than the Detroit projects, nearly all the priciest projects are needed for reliability purposes.

MTEP 19 contains MISO and MISO, PJM Poised for 1st Major Interregional Project.)

However, formal approval of the interregional project must wait until at least March, along with MISO’s first-ever storage-as-transmission asset (SATA) project. The RTO has yet to finalize rules to govern either project.

In the case of the MEP, MISO is still working on a cost allocation ruleset that can win Despite Pushback, MISO Pursuing TO-only SATA.)

MISO Board MTEP
MTEP 19 spending by planning region | MISO

MISO on Thursday filed a plan with FERC to permit storage facilities to provide transmission services (ER20-588). The RTO characterized the proposal as a “fundamental first step forward for the use of storage resources to maximize the reliability and efficiency of the electric system.”

The SATA plan would require that the assets be used only for transmission purposes, barring them from simultaneous participation in energy markets, but the 800-page filing contains a promise that MISO and its stakeholder community would soon begin exploring how storage devices could serve both transmission and market functions.

“Accepting these proposed revisions will allow for the immediate adoption of storage facilities to serve a transmission function in MISO. And in early 2020, MISO and its stakeholders intend to begin the process of addressing the issues related to using storage as both transmission assets and to provide market services,” the RTO told the commission.

Disagreement on Michigan Interconnection Project

Like last year, a stakeholder is once again disputing a small Michigan interconnection project for resembling distribution.

DTE Energy has said the $8.6 million, 120-kV city of Croswell interconnection project in eastern Michigan is more distribution than transmission in nature and should not be included in this year’s transmission buildout package. The company’s Nick Griffin said the line is “clearly radial” in nature.

Johnson said MISO analysis indicated the project should be classified as a transmission line.

“Our recommendation is to leave the project in inclusion in Appendix A,” Johnson told board members in November.

Johnson said the situation is similar to MTEP 18’s Morenci project, which Consumers Energy disputed. (See Michigan Regulators Intercede in MTEP Complaint.) The Michigan Public Service Commission has since reviewed the characteristics of the $21 million, 138-kV line near the Michigan-Ohio border and last month classified it as distribution, dropping it from MTEP eligibility.

“However, that determination is open to rehearing,” Johnson said.

Griffin said it would be “prudent” for MISO to delay approval of the Croswell line until FERC weighs in on the Morenci project. The project was nevertheless included in MTEP 19 approval.

Helena-to-Hampton Corners Heartburn

Johnson said MISO still stands firm that the Helena-to-Hampton Corners project cannot pass necessary robustness testing to be included as a MEP in this year’s package.

Renewable generation proponents had urged MISO to include the $36.1 million, 345-kV project, originally identified in this year’s Market Congestion Planning Study. The project was set to solve congestion in southern Minnesota at a 4.22:1 benefit-to-cost ratio, but MISO said the project quickly lost value once forecasted wind generation was removed from the equation.

No-go for MISO Board Election Changes

By Amanda Durish Cook

INDIANAPOLIS — MISO’s Advisory Committee has decided not to pursue changes to how the RTO vets and selects its Board of Directors after more than a year of discussion and the creation of a special task team to explore the issue.

The AC said Wednesday it would not recommend changes to expand the stakeholder voice on MISO’s Nominating Committee, declining all possible options laid out by the Board Qualification Task Team (BQTT). (See Task Team: Boost Member Role in MISO Board Selection.)

MISO board changes
Advisory Committee Chair Audrey Penner | © RTO Insider

“The result was to maintain the status quo,” AC Chair Audrey Penner told members at a committee meeting Wednesday.

Penner said that while some stakeholders might have wanted to see change, she hoped members saw the value of what she called a high-functioning board.

Board Chair Phyllis Currie said she expected the AC would continue to periodically examine the board’s makeup.

“In this kind of organization, that conversation will come up time and time again,” she told Penner at the board’s meeting Thursday.

The BQTT in September released a list of options that included requiring state and federal regulators to observe a yearlong “cooling-off” period before becoming eligible for nomination to the board, possibly reserving one of the nine director seats for those with experience representing utility customer interests, and doubling the number of stakeholder representatives from two to four on the Nominating Committee that selects board candidates.

Another option would have rotated the sectors from which stakeholder participants are drawn for the Nominating Committee or reserved a designated seat for a member of the Organization of MISO States. A final option would have set aside one of the nine director seats for someone with recent experience representing electric utility customer interests.

Had the AC recommended any changes, they would have gone before the board’s Corporate Governance and Strategic Planning committees as suggestions only.

The BQTT was created in response to last year’s election of Minnesota Public Utilities Commission Chair Nancy Lange to the board while she was still serving on the commission. Some stakeholders questioned the independence of sitting regulators appointed to the RTO’s oversight body. (See MISO Members Uneasy over Board Nomination.)

OMS has also sent a short letter to the board conveying its “strong interest to be a regular and active participant in the Nominating Committee,” according to organization President Matt Schuerger. One of the Nominating Committee’s two stakeholder seats is typically reserved for an OMS representative. Schuerger said he expected regulator participation to continue shaping the board’s makeup.

MISO Board of Directors Briefs: Dec. 12, 2019

INDIANAPOLIS — MISO’s Board of Directors will remain unchanged heading into 2020 after the same chairman and three incumbent directors were elected to retain their positions at last week’s final Board Week of the year.

RTO members voted for Todd Raba, Trip Doggett and Barbara Krumsiek to remain on the board through the end of 2022. (See MISO Board of Directors Briefs: Sept. 18, 2019.)

MISO
MISO Board Week was held at the Conrad hotel in downtown Indianapolis. | © RTO Insider

Reporting results at the board’s meeting Thursday, MISO General Counsel Andre Porter said of 146 eligible voting members, 84 cast votes, easily passing the 25% voting participation quorum. Voting was held Sept. 1 through Nov. 26.

This year, the board also filled exiting Director Thomas Rainwater’s vacant seat with former New York Power Authority CFO Robert Lurie, who appeared at Board Week.

The meeting also saw directors vote unanimously to re-elect Phyllis Currie to a second year as their chairman.

“I tell a lot of my California colleagues that they could learn a lot by how MISO engages with stakeholders,” Currie said, accepting the position.

MISO
MISO CEO John Bear and Board Chairman Phyllis Currie | © RTO Insider

She opened the meeting by reminding staff and members of the RTO’s compliance hotline, where individuals can privately report suspected unlawful, unethical or inappropriate behavior.

In the latter half of 2020, MISO will hold a nomination and election to replace Director Baljit Dail, who has already exceeded his three-term limit; the Nominating Committee in 2017 waived his limit and allowed him to stand for an additional term. At the time, the committee cited MISO’s multiple new directors and Dail’s much-needed information technological experience as the reason for the waiver. (See “Committee Permits Consideration of Extra Term for Dail,” MISO BoD Briefs: June 22, 2017.)

Private Cloud Prepped for New Market Platform

MISO is wrapping up the third year of a seven-year effort to replace its market platform, this year establishing a private cloud-based server that will host the new platform’s modular server.

“We continue to accept market deliverables and find them acceptable,” Senior Director of Market System Enhancements Kevin Sherd told directors at a Dec. 10 meeting of the board’s Technology Committee.

Chief Information Security Officer Keri Glitch said MISO is still running two environments while it learns and discovers efficiencies in the cloud.

MISO will have spent about $20 million on the platform replacement this year, about $500,000 below budget because of a later-than-expected Storage Plans Clear FERC with Conditions.)

The RTO next year plans to make the cloud operational and test it using non-critical infrastructure protection data. By year’s end it will test the new market user interface with customers and begin uploading operations model data into its model manager, which is designed to be a singular repository for its many planning models.

The tasks are the major highlights of MISO’s 2020 to-do list. Vice President of Market System Enhancements Todd Ramey has said the RTO has about 200 deliverables it must complete over the year as part of the project.

“Two-thirds of the work is still in front of us,” said Ramey, who also reassured board members that MISO is “encouraged” by main vendor General Electric’s recent performance.

“We’re trying to be cautious and not too optimistic because … a lot of challenges lay before us,” he added.

MISO
MISO used the Indianapolis Arts Garden over Washington Street for lunch and a reception. | © RTO Insider

MISO expects to introduce its new day-ahead market clearing engine on the private cloud in 2022.

Meanwhile, the RTO reported that it blocked 8.1 billion connections into its systems year-to-date in 2019, a 54% increase from last year. It also reported it had a 2.15% average click rate on phishing attempts in 2019, below the 5.3% industry average.

Glitch also said that over Aug. 22-26, MISO’s energy management system (EMS) experienced multiple slowdowns while trying to access its network-attached storage. “File transfer between EMS and market systems was interrupted during these slowdowns,” Glitch reported.

Glitch said that while MISO largely cleared up the problem, smaller, infrequent slowdowns persist. She said a small, dedicated team is working to identify the root cause of the problem.

MISO Slightly Overbudget in 2019

MISO expects to spend nearly $274 million in base operating expenses by year-end, exceeding its 2019 budget by about $1.3 million (0.5%).

CFO Melissa Brown said the overage is the result of MISO reclassifying some capital expenses as operating expenses.

MISO’s capital spending will likely reach $23.6 million, underbudget by $600,000 (2.7%).

The RTO has set a $337.6 million total operating budget and a $30.4 million capital expense budget for 2020.

MISO: We’re Going to Disney World!

MISO will break with tradition in 2020, holding its final Board Week of the year outside the footprint in Orlando, Fla., instead of near its headquarters in central Indiana.

MISO released a schedule of 2020 quarterly board meeting dates:

  • March 24-26 in New Orleans;
  • June 16-18 in Milwaukee;
  • Sept. 15-17 in St. Paul, Minn.; and
  • Dec. 8-10 in Orlando.

— Amanda Durish Cook

NERC Plans Review of Supply Chain Standards

By Rich Heidorn Jr.

NERC announced Thursday it will conduct a formal review of the effectiveness of its new supply chain standards, which take effect July 1.

Howard Gugel, NERC’s vice president for engineering and standards, outlined the plan during the Board of Directors’ conference call Thursday, at which the board also approved its 2019 Long-Term Reliability Assessment and the revised ERO Enterprise Long-Term Strategy.

NERC Supply Chain Standards
Howard Gugel, NERC | © ERO Insider

Gugel said NERC plans to report on its findings to the board after the first two years of the standards’ implementation.

The critical infrastructure protection (CIP) standards — CIP-013-1 (Cyber Security – Supply Chain Risk Management), CIP-005-6 (Cyber Security – Electronic Security Perimeter(s)) and CIP-010-3 (Cyber Security – Configuration Change Management and Vulnerability Assessments) — were developed in response to FERC Order 829, issued in 2016.

The commission approved the standards, intended to mitigate supply chain risks in industrial control system hardware, software, and computing and networking services, in 2018. (See FERC Finalizes Supply Chain Standards.)

Gugel said ERO staff will conduct surveys on supply chain awareness and collect statistics on identified “key risk indicators,” including software validation discrepancies, vendor vulnerability and cybersecurity incidents.

NERC will examine supplier contracts to determine whether entities have been able to negotiate language that includes required supply chain controls and analyze supply chain training and communications, including inquiries to the Electricity Information Sharing and Analysis Center (E-ISAC), to determine how well vulnerabilities have been identified and communicated.

Gugel said staff will make periodic reports to the Reliability and Security Technical Committee, and its formal report to the board could include recommendations for improvements to the standards.

“Every time I hear a presentation about supply chain risk, I am impressed with the complexity of this challenge and how important it is, so I think following through on the effectiveness review is really important,” Chair Roy Thilly said.

In response to Thilly’s question, Gugel said staff will look at how consistently the standards are being enforced and how facilities are characterized for application to the rules.

“I agree with your analysis” of supply chain issues, he told Thilly. “It seems like an onion. Every time we go to it, there’s another skin that needs to be peeled back.”

Trustee Jan Schori asked for interim reports on staff’s findings. “It’s also a very high visibility issue; people are extremely interested in it,” she said. Two years “seems kind of long to me.”

“Yes. We could absolutely do that,” Gugel responded.

Strategy Update OK’d

The board approved a revised ERO Enterprise Long-Term Strategy, which was last updated in 2017. NERC said the revisions were part of an effort to streamline its strategic and operational documents and ensure alignment with the Reliability Issues Steering Committee’s identification of bulk power system risks.

The document is based on four “value drivers,” including the use of innovative, risk-based programs, and balancing industry collaboration with independence and objectivity.

It identifies five long-term “focus areas,” including further development of the E-ISAC, strengthening “engagement” and seeking opportunities for “effectiveness, efficiency and continuous improvement.”

NERC CEO Jim Robb described the document as “the culmination of very collaborative work between NERC and the regional entities” and also incorporates feedback from stakeholders’ comments on earlier drafts. (See Strategy Plan Prompts ‘Cost-benefit’ Discussion at MRC.)

Robb said “alignment” between NERC and the REs “was something we were aiming for and I think a big step forward from what we had the last time we [wrote] the strategy.”

“Much of the social fabric that’s embedded in the strategy in terms of improving collaboration … I think we already have good proof points that that’s well in motion,” he continued, citing NERC’s “positive steps with the Transmission Forum.”

Thilly acknowledged that the final draft incorporated the board’s comments as well. “I particularly appreciate that it’s only nine pages long and not 80 pages long,” he added. “It’s concise and clear, which is really helpful.”

The 2019 Long-Term Reliability Assessment, which the board also approved, will be released next week.

Elections Underway for New NERC Panel

By Holden Mann

ATLANTA — It’s musical chairs for those seeking to join NERC’s new Reliability and Security Technical Committee (RSTC), with 35 stakeholders vying for 14 seats in seven sectors.

The 34-member RSTC next year will take over the duties of the Planning, Operating and Critical Infrastructure Protection committees, which have more than 120 members combined. (See NERC Board OKs Committees Merger.)

At a joint meeting of the three committees this week in Atlanta, MISO’s David Zwergel, who will be vice chair of the new group, told members that NERC has completed the sector nomination period, the first stage of the membership selection.

NERC RSTC committee formation

| NERC

Two representatives each were sought from sectors 1-10 and 12, but all but four of the sectors submitted more than two nominees; they are holding elections through Dec. 20 to narrow it down to two. Sectors 1 (investor-owned utilities) and 9 (small end-use electricity customers) each have seven candidates. Sectors 4 (federal or provincial utilities/power marketing administrations) and 8 (large end-use electricity customers) have five candidates each.

The remaining sectors did not require elections, so their representatives will take their seats at the RSTC’s first meeting in March:

  • Sector 3 (cooperatives): Ben Engelby of Arizona Generation and Transmission Cooperatives, and Marc Child of Great River Energy;
  • Sector 5 (transmission-dependent utilities): John Stephens of City Utilities of Springfield, and Carl Turner of Florida Municipal Power Agency;
  • Sector 10 (ISOs/RTOs): Christine Hasha of ERCOT, and Wesley Yeomans of NYISO; and
  • Sector 12 (state governments): Christine Ericson of the Illinois Commerce Commission, and Cezar Panait of the Minnesota Public Utilities Commission.

At-large Nominations Begin this Month

NERC RSTC
David Zwergel, MISO | © ERO Insider

The remaining 10 seats on the new committee will be filled by at-large members to be chosen on Feb. 6 by its Nominating Subcommittee, initially composed of Zwergel and Chair Greg Ford; NERC Chair Roy Thilly; CEO Jim Robb; and Member Representatives Committee Vice Chair Jennifer Sterling. Nominations for at-large members will open Dec. 30 and close on Jan. 10, with the resulting candidates judged based on how they reinforce and complement sector appointees’ strengths.

“If you were nominated [as] a sector rep and weren’t selected … through the election, you’re not automatically put in the at-large, but you can nominate yourself again,” Zwergel said. “The [factors] to be considered [are] interconnection diversity, Canadian representation, broad spectrum of [entity] sector and size, and then expertise.”

Beginning with the first RSTC meeting in June, half of the initial member slate will serve two-year terms, while the rest will serve for three years; following the initial terms, future members will serve for two years, to expire in June of alternating years.

Communication Plan Suggested

Members of the three retiring committees raised no major objections to the existing transition plan. However, Peter Brandien of ISO-NE suggested that NERC consider the impact of the smaller RSTC membership, particularly regarding communicating the committee’s decisions to the broader industry.

“It is going to be a much smaller group, so you’re losing the benefit of providing the information to a large audience that … can then take [it] back to their home office [and] distribute [it],” Brandien said. “So, I think the committee has to think about how to get that information out to industry a bit more.”

While the RSTC is set up, the OC, PC and CIPC will continue to meet according to their current schedules. The RSTC will hold its first meeting March 4 to elect the executive committee and hold its initial regular meeting in June to coincide with the final meetings of the retiring committees.

CAISO Reports Wholesale Prices Way Down in Q3

By Hudson Sangree

CAISO’s Department of Market Monitoring reported significantly lower wholesale electricity prices in the ISO during the third quarter this year, driven by lower natural gas costs and fewer transmission constraints than in previous quarters.

“Market prices were very low relative to our historical Q3 prices and highly competitive,” Amelia Blanke, manager of monitoring and reporting for the ISO’s Department of Market Monitoring, told participants on a call Tuesday. “The big factors that were driving that were gas prices … higher renewables, particularly hydro, and low congestion.”

Average gas prices were down nearly 44% from the third quarter of 2018. That drove the cost of wholesale electricity down from $68/MWh to $39/MWh.

“That’s a dramatic reduction,” Blanke said.

CAISO Wholesale Prices
Total Q3 wholesale costs were down from Q3 2018. | CAISO

Volatile gas prices have been the major source of price spikes and decreases this year and last.

In the first quarter this year, a huge spike in natural gas costs drove up prices by more than 40% compared with the same period a year before, the DMM said. (See Gas Spike Drove High CAISO Power Costs in Q1.)

Average hourly hydropower production rose by approximately 2,000 MW in July compared to the same month a year before, according to the market presentation.

The comparative lack of major wildfires during the summer and early fall months, the start of California’s fire season, meant transmission lines weren’t down for extended periods.

“We had relatively few transmission-related outages causing congestion as well as low fires within Q3,” Blanke said.

Congestion revenue rights losses for ratepayers also continued to fall because of settlement changes and lower congestion, Blanke said.

CAISO Wholesale Prices
CAISO’s control room in Folsom, Calif. | CAISO

Ratepayers have been covering big losses in the CRR auctions since they were implemented in 2009 because of the difference between revenues and payments to CRR holders, the DMM has found. The loss to ratepayers had reached $860 million as of late last year, the department said earlier this year.

The main beneficiaries have been financial entities that purchase the CRRs, betting on profits.

Changes implemented in January significantly reduced the number and pairs of nodes at which CRRs can be purchased in the auction. They also limited net payments to CRR holders when payments exceed congestion charges collected in the day-ahead market, CAISO said.

Payments have exceeded auction revenues in every quarter this year, including by $4.1 million in Q3, the DMM reported. In comparison, CRR auction payments outpaced revenues by approximately $180 million over Q4 2017 through Q4 2018.